25 Berkeley Square creates an additional 47,000 sqft of office and retail space in the heart of Mayfair.

 

Atomik were appointed on behalf of the contractor, Synergy, to provide contractor’s proposals under a traditional contract which included a large number of Contractor Design Portions.

 

We were responsible for the package coordination between the design team and the contractor’s supply chain. Planning the technical resolution and sequencing of the works whilst ensuring compliance with the employer’s requirements and planning consent.

 

Packages of work included two additional storeys to the building, Cat A office space, new external stone wall systems, intricate lead and metal work and the new retail areas.

 

5.

The building’s heritage has been carefully conserved and the interior has been
optimised for 21st century business, with an equally contemporary aesthetic.

4.

The project was under construction for 18 months.

3.

As part of the technical design development, the team visited the metalwork foundry of James Hoyle and Sons

2.

A detailed 3D model enabled the team to work through complex junctions

1.

Initially drawings were colour coded to coordinate sub-contractor sequencing